We completed a comprehensive electrical upgrade at a flat in Royal Earlswood Park, Redhill. This included installing 16-20 new downlights in the hallway and kitchen, wiring and connecting sockets in the kitchen, and setting up a new induction hob. The project involved meticulous inspection, wiring, and testing to ensure safety and efficiency.
Action Taken:
• Conducted visual inspection of the electrical system.
• Installed downlights in the hallway and kitchen.
• Set up kitchen sockets.
• Connected and wired a new induction hob.
• Post-installation testing and inspection.
• Cleaned the site and conducted a customer debrief.