The project involved partial rewiring of circuits and the replacement of an old fuse board to meet
NICEIC compliance. Additional upgrades included the installation of new sockets and switches, as well as energy-efficient lighting solutions. Comprehensive testing and cleaning were performed to ensure safety and satisfaction.
Lumiel conducted a detailed inspection and partially rewired the property's electrical systems.
The outdated fuse board was replaced with a compliant, modern unit, and new sockets, switches, and lighting were installed. Post-rewiring testing ensured all systems met safety standards.