The project involved adjusting 10 sockets at 21 Fortescue Avenue to the standard height. The team conducted a detailed inspection, made the necessary rewiring adjustments, and tested the entire system to ensure safety and efficiency. Customer feedback was gathered for quality assurance.
Action Taken
• Confirmed job scope and customer requirements.
• Adjusted 10 sockets to the standard height.
•Conducted visual inspections of the electrical system.
• Performed rewiring and infrastructure modifications.
• Post-adjustment testing to ensure functionality.
• Cleaned the site and provided a detailed customer debrief.